The forward-looking facilities designer knows that fiber counts in both outside plant (OSP) and Intra-Facility Cable (IFC) increase rapidly, sometimes even before a project finishes. A critical piece of an advanced design is the building entrance termination point, where the OSP and IFC cables are joined, managed, distributed, and protected.
CommScope has engineered its building entrance cabinet line to solve the most demanding requirements of an advanced building entrance strategy, including:
- Density
- Space efficiency
- Flexibilidade
- Acessibilidade
- Installer friendliness
- Robustness